Optimization of the crude oil degasification TP 3

Type of Contract/ Completion:

Fixed Price/ 2018

Scope of Supply and Services:

Optimization of inlet condition of the crude oil pumps, improvement of the crude oil degasification by vessel installations, optimization heat recovery and decrease in pressure.

  • Extended-Basic-Engineering
  • Participating disciplines: project management, process engineering, piping design and layout planning, civil and structural steel
  • Engineering, Mechanical Engineering, Electrical Engineering, Instrumentation and Control, Procurement

 Technical Key Figures:

Main Equipment: 1 (incl. 4 Package Units)
Structure: 36,5 t
Foundation: 139 m³
Pipelines: app. 800 m
Instruments: 21

 

About Griesemann Group

The businesses belonging to the group of companies, INDUREST, JBV, JBV-INDUREST, GMR and Blitzschutz Graff, combine almost all specialist trades for industrial plant engineering and construction, and through a synergetic cooperation of all business units are capable of realising not only complete turnkey projects but also operations-driven individual projects.