Home → References → Construction and Erection of a Polyol- and diethylene glycol – Tank Farm including truck loading station
Construction and Erection of a Polyol- and diethylene glycol – Tank Farm including truck loading station
Type of Contract / Completion:
EPC / 2011-2013
Scope of Supply and Services:
Construction and Erection of a Polyol- and diethylene glycol – Tank Farm including truck loading station and utility station
- Extended Basic-Engineering (all sectors)
- Detail-Engineering (all sectors)
- Procurement
- Construction management (structural technology, steelwork, piping installation, insulation, EIC, fire protection, control panel construction, lightning protection)
- Installation supervision and commissioning
- Project management
Technical Key Figures:
reinforced concrete parts: about 130 m³ concrete with 65 t reinforcing steel
Structural steel: 94 t steel
piping installation: 184 pipes – Spools with IC pins
thereof: 138 pipes
results: 184 assembly isometries, composed of -1 until 10 – 12 isometry sheets
Fitting : 600 fittings
ICS: 96 ICS + 40 controlled electric heater circuit
Controller: Yokogawa Centum + Prosafe
Zeitraffer Aufbau:
Contact:
Griesemann Group
Phone: +49 (0)2232 708-0
Fax: +49 (0)2232 708-100
kontakt@